These four work-in-progress shots show the main shrine now permanently attached to the 2 foot x 2 foot gaming tile, the wire for the lit monolith is now fed through a small hole in the base to a cut-out for the battery compartment.
The main stone area is raised on a sheet of spare foamboard (you can see it under the steps) and fixed to the main board with lots of steel pins and PVA glue. The groundwork is pre-mixed filler and PVA glue which when dry will be covered in sand and small stones. For now I have brought it into the kitchen in the hope that it will dry through and not warp.
Tony
No comments:
Post a Comment