Sunday, 25 October 2026

Christmas 2025 Project - update # 17


One of my favourite parts of modelling these small narrow gauge layouts is adding all the clutter and small detailing. In this case finally adding the kibble or ore bucket to the end of the cable and some of the scratch built or salvaged items that I have been working on to decorate the side of the building.


These images show some of these bits of clutter 'bedded' in to the groundwork with sieved stones and sand applied over PVA glue.


The cable was modelling from some white thread which was dyed dark grey before being 'aged' with rust washes and runs from the bucket, up over the shieve wheel or main bearing and back in to the gondola where it is tied off on a piece of plastic rod and glued with superglue.


You should also be able to see where I have continued to add weathering and small details to the main mine building, a process that is never truly finished.

Tony

2 comments:

Codsticker said...

The additional pieces really add that extra bit of realism. I really like that have included (what I think is) a boiler.

Tony said...

The used and rather dilapidated boiler was constructed from a road roller front roller and detailed with plastic card and Slaters plastic letters as seen in a picture in The Gazette narrow gauge magazine. It is intended as a piece of run down scrap - like the odd bits of detritus you often find handing around old mine buildings.